BESS simulation

Wheeling charges (託送料金)

Demand-side wheeling a grid battery pays on what it charges: a basic charge per kW of contract per month and an energy charge per kWh, by area and connection voltage, with every revision since the first tariff entered.

Connection

Wheeling basic (JPY/kW/mo)

Effective-date history. Each line holds its published rate until the next entered version; draft values have not yet been checked against the source page.
300400500600700JPY/kW/moDec 2019Dec 2021Dec 2023Dec 2025

Wheeling energy (JPY/kWh)

Effective-date history. Each line holds its published rate until the next entered version; draft values have not yet been checked against the source page.
0.60.811.21.41.61.8JPY/kWhDec 2019Dec 2021Dec 2023Dec 2025

Current rates by area

In force on 2026-11-11, with the next published change. Drafts are read from the tariff PDFs and not yet checked against the page.

AreaWheeling basic (JPY/kW/mo)Wheeling energy (JPY/kWh)FromNext changeStatusSource
Hokkaido628.101.022026-11-01—drafthepco.co.jp · p. 58
Tohoku531.300.972026-11-01—draftnw.tohoku-epco.co.jp · p. 47
TokyoNot entered yet: the simulation uses METI's national average.
Chubu381.820.882026-11-01—draftpowergrid.chuden.co.jp · p. 86
Hokuriku572.000.852026-10-01—draftrikuden.co.jp · p. 68
Kansai457.600.852026-11-01—draftkansai-td.co.jp · p. 67
Chugoku486.180.782026-11-01—draftenergia.co.jp · p. 74
Shikoku510.400.772026-10-01—draftyonden.co.jp · p. 53
Kyushu584.641.242026-11-01—draftkyuden.co.jp · p. 78
OkinawaNot entered yet: the simulation uses METI's national average.

History

Every version, newest first. A new version is listed whenever the tariff was re-issued, even if a rate did not change.

AreaFromUntilWheeling basic (JPY/kW/mo)Wheeling energy (JPY/kWh)Change (Wheeling basic)StatusSource
Kyushu2026-11-01—584.641.24+21.3%draftkyuden.co.jp · p. 78
Kyushu2026-10-012026-11-01482.051.27—draftkyuden.co.jp · p. 78
Kyushu2026-04-012026-10-01482.051.27—draftkyuden.co.jp · p. 77
Kyushu2025-04-012026-04-01—1.27—draftkyuden.co.jp · p. 78
Kyushu2024-10-012025-04-01—1.27—draftkyuden.co.jp · p. 78
Kyushu2024-04-012024-10-01—1.27—draftkyuden.co.jp · p. 73
Kyushu2023-12-272024-04-01—1.64—draftkyuden.co.jp · p. 69
Kyushu2023-04-012023-12-27—1.64—draftkyuden.co.jp · p. 69
Kyushu2022-07-012023-04-01—1.49—draftkyuden.co.jp · p. 68
Kyushu2022-04-122022-07-01—1.49—draftkyuden.co.jp · p. 68
Kyushu2022-04-012022-04-12434.501.49—draftkyuden.co.jp · p. 67
Kyushu2022-01-012022-04-01—1.49—draftkyuden.co.jp · p. 68
Kyushu2021-04-012022-01-01—1.49—draftkyuden.co.jp · p. 67
Kyushu2020-10-012021-04-01434.501.49—draftkyuden.co.jp · p. 65
Shikoku2026-10-01—510.400.77—draftyonden.co.jp · p. 53
Chugoku2026-11-01—486.180.78+26.6%draftenergia.co.jp · p. 74
Chugoku2026-10-012026-11-01383.900.70—draftenergia.co.jp · p. 74
Chugoku2026-04-012026-10-01383.900.70—draftenergia.co.jp · p. 74
Kansai2026-11-01—457.600.85+4.0%draftkansai-td.co.jp · p. 67
Kansai2026-10-012026-11-01440.000.84—draftkansai-td.co.jp · p. 67
Kansai2026-04-012026-10-01440.000.84—draftkansai-td.co.jp · p. 67
Kansai2025-04-012026-04-01440.000.84—draftkansai-td.co.jp · p. 66
Kansai2024-10-012025-04-01440.000.84—draftkansai-td.co.jp · p. 66
Kansai2024-04-012024-10-01440.000.84—draftkansai-td.co.jp · p. 60
Kansai2023-12-272024-04-01440.001.24—draftkansai-td.co.jp · p. 58
Kansai2023-04-012023-12-27440.001.24+8.1%draftkansai-td.co.jp · p. 58
Kansai2022-07-012023-04-01407.001.24—draftkansai-td.co.jp · p. 58
Kansai2022-04-122022-07-01407.001.24—draftkansai-td.co.jp · p. 58
Kansai2022-04-012022-04-12407.001.24—draftkansai-td.co.jp · p. 58
Kansai2022-01-012022-04-01407.001.26—draftkansai-td.co.jp · p. 60
Kansai2021-04-012022-01-01407.001.26—draftkansai-td.co.jp · p. 60
Kansai2020-10-012021-04-01407.001.26—draftkansai-td.co.jp · p. 59
Kansai2020-04-012020-10-01407.001.20—draftkansai-td.co.jp · p. 56
Kansai2020-02-012020-04-01407.001.20—draftkansai-td.co.jp · p. 56
Kansai2019-10-012020-02-01407.001.20—draftkansai-td.co.jp · p. 56
Hokuriku2026-10-01—572.000.85—draftrikuden.co.jp · p. 68
Chubu2026-11-01—381.820.88+6.8%draftpowergrid.chuden.co.jp · p. 86
Chubu2026-10-012026-11-01357.500.88—draftpowergrid.chuden.co.jp · p. 86
Tohoku2026-11-01—531.300.97+15.0%draftnw.tohoku-epco.co.jp · p. 47
Tohoku2026-10-012026-11-01462.000.97—draftnw.tohoku-epco.co.jp · p. 47
Tohoku2026-04-012026-10-01462.000.97—draftnw.tohoku-epco.co.jp · p. 47
Hokkaido2026-11-01—628.101.02+21.7%drafthepco.co.jp · p. 58
Hokkaido2026-10-012026-11-01515.901.02—drafthepco.co.jp · p. 58
Hokkaido2026-04-012026-10-01515.901.02—drafthepco.co.jp · p. 57
Hokkaido2025-10-012026-04-01515.901.02+2.4%drafthepco.co.jp · p. 56
Hokkaido2025-04-012025-10-01503.800.92—drafthepco.co.jp · p. 56
Hokkaido2024-10-012025-04-01503.800.92—drafthepco.co.jp · p. 56
Hokkaido2024-04-012024-10-01503.800.92+2.9%drafthepco.co.jp · p. 52
Hokkaido2023-12-272024-04-01489.501.34—drafthepco.co.jp · p. 50
Hokkaido2023-07-012023-12-27489.501.34—drafthepco.co.jp · p. 50
Hokkaido2023-04-012023-07-01489.501.34+17.1%drafthepco.co.jp · p. 50
Hokkaido2022-07-012023-04-01418.001.63—drafthepco.co.jp · p. 50
Hokkaido2022-04-122022-07-01418.001.63—drafthepco.co.jp · p. 49
Hokkaido2022-04-012022-04-12418.001.63—drafthepco.co.jp · p. 49
Hokkaido2022-01-012022-04-01418.001.63—drafthepco.co.jp · p. 49
Hokkaido2021-04-012022-01-01418.001.63—drafthepco.co.jp · p. 49
Hokkaido2020-10-012021-04-01418.001.63—drafthepco.co.jp · p. 49
Hokkaido2020-04-012020-10-01418.001.64—drafthepco.co.jp · p. 48
Hokkaido2020-02-012020-04-01418.001.64—drafthepco.co.jp · p. 48
Hokkaido2019-10-012020-02-01418.001.64—drafthepco.co.jp · p. 48