Battery storage by prefecture

Where Japan's grid-scale battery projects are, summarised by prefecture. Free to use; project names and sites stay in the registry.

projects
445
disclosed
5,053MW
disclosed
18,593MWh
prefectures with projects
45
of disclosed MW is in the top 5 prefectures
48%

Map of disclosed capacity

Disclosed capacity (MW)025100250500+Projects, but no MW reported yetNo projectsSelect a prefecture to open its projects.
Hokkaido北海道
Projects
31
MW
745
MWh
2,369
Stage mix (projects)OperatingConstructionPlannedMW reported for 31 of 31 projectsOpen projects →

All prefectures

OperatingConstructionPlanned
PrefectureProjectsMWMWhStage mix (projects)
Hokkaido317452,369
Shizuoka234731,527
Fukushima124261,681
Fukuoka313811,537
Oita12253912
Shiga10198793
Okayama11197760
Tochigi18172683
Hyogo13157624
Yamagata4154634
Kumamoto19135498
Nagano15118431
Saitama27117434
Osaka3112427
Kanagawa5111479
Miyagi1082275
Ibaraki679274
Niigata777342
Gunma2068271
Kyoto1067278
Yamaguchi962203
Mie1261248
Wakayama658153
Hiroshima655196
Toyama252223
Fukui252208
Miyazaki946186
Gifu1344177
Nagasaki537152
Kagoshima931122
Saga1030118
Chiba132282
Aichi112184
Iwate42083
Shimane81873
Tottori71458
Ehime11236
Okinawa11015
Tokushima4820
Akita3624
Aomori2416
Ishikawa2412
Tokyo128
Yamanashi128
Kagawa128
Prefecture not yet known16257852
Japan4455,05318,593

How these figures are built

  • Totals count every published project in the registry. MW and MWh add up only the projects that report them, so they are lower bounds.
  • A project listed under several prefectures is counted once, on its own line, so the map adds up to the national total.
Battery storage projects →