OperatingKyushu · Karatsu-shi, Saga

NC Karatsu Ochicho Battery Storage Facility≈NC唐津市相知町蓄電所

Power1.988MW
Energy8.146MWh
Duration4.1h
COD2025-10-01
Announced2026-04-03

運転中(REI 2026-03時点の一覧に掲載。運転開始 2025-10)

Participants

Developer
NIPPON CHIKUDENCHI, INC.日本蓄電池株式会社
TNSP
Kyushu Electric Power Transmission and Distribution九州電力送配電