JEMIJEMI · Japan Energy Market IntelligenceEnergy & infrastructure data for Japan
Overview
Insights
Contact
Sign in
All terms
Glossary · Co-optimised market (proposal)

Block loading固定出力

Also called: Block loaded

Proposal under study

Definition

Condition in which registered minimum and maximum outputs coincide, leaving no dispatchable range.

In Japanese

固定出力

登録する出力上下限が同値であり、市場による出力変更の余地がない状態。

Sources

  • 第10回同時市場の在り方等に関する検討会:略語の正式名称と用語の定義 — METI

More in Co-optimised market (proposal)

  • Activation-constrained balancing capacity発動制限ΔkW
  • Co-optimization market同時市場
  • Combined clearing複合約定
  • Constraint制約条件
  • Day-ahead co-optimization market前日同時市場
  • Dispatchable range出力配分可能領域
  • Economic dispatch経済負荷配分
  • Economic maximum出力容量上限
All →
JEMI — Japan Energy Market IntelligenceGlossaryPrivacy PolicyData Usage & Licensing PolicyData compiled from public sources. Check sources before relying on figures.