Japan electricity market glossary
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
396 terms
Also called: Dispatch instruction
Instruction requiring a resource to activate its balancing response.
Balancing capability whose activation is restricted because it could recreate network congestion.
Also called: Real power
Component of electrical power converted into net work, heat or other energy forms.
Also called: Measured value
Value measured or established from actual outcomes.
Also called: Derating factor
Factor used to convert nominal capacity into assessed available capability.
Also called: ANRE
METI agency responsible for energy security and resource policy.
Also called: AC
Entity coordinating aggregated resources and transactions with markets or counterparties.
Entity coordinating distributed resources for collective control or market participation.
Magnitude of AC power based on RMS voltage and current, measured in VA.
Also called: Zonal price
Clearing price for an individual market area reflecting interconnector constraints.
Also called: Performance assessment
Evaluation of delivery and response performance against obligations.
Also called: Successful bid
Acceptance of a bid through an auction.
Fiscal year in which an auction takes place.
Also called: Auction award results
Auction outcome including successful bids, quantities or prices as disclosed.
Also called: Auxiliary load
Power consumed by supporting systems such as cooling and controls.
Also called: Available connection capacity
Grid capability remaining available for additional use or connections under applicable conditions.
Amount of capacity awarded in an auction.
Also called: Auction clearing price
Price applicable to a successful auction award.
Also called: Main transmission network
Principal transmission network carrying bulk electricity.
Also called: Balancing reserve
Capability to adjust generation or demand to correct supply-demand deviations, generally measured in kW.
Also called: Delta kW
Amount of adjustable power available for balancing, expressed in kW.
Also called: Delta-kW price
Unit price for reserving adjustable power capability rather than delivered energy.
Acquisition of balancing capability through markets or contracts.
Energy actually delivered or adjusted when balancing capability is activated.
Settlement amount for energy adjusted in response to balancing instructions.
Unit price for settling energy associated with balancing activation.
Also called: BG
Group within which scheduled and actual electricity volumes are managed for balancing.
Also called: Supply and demand balancing market · Supply-demand balancing market
Market for procuring resources that help network utilities maintain frequency and balance supply and demand.
Revenue earned through balancing market participation and associated services.
Also called: FIP base price
Base price used as a benchmark in calculating the FIP premium.
Reference estimate of consumption or output without an activation.
Also called: Storage battery · Rechargeable battery
Rechargeable electrochemical device storing energy for subsequent electrical discharge.
Also called: BESS augmentation
Addition of battery equipment to increase or restore storage capacity.
Basic electrochemical unit of a battery.
Enclosure housing battery racks and supporting protection and thermal systems.
Also called: BMS
System monitoring and managing cell conditions, charge state and other parameters for safe battery operation.
Assembly of multiple battery cells.
Structural and electrical assembly containing multiple battery modules.
Also called: Battery energy storage facility · Battery energy storage plant
Facility primarily used to store electricity and exchange power with the grid.
Also called: Battery energy storage system
Integrated battery, power conversion and control equipment for electrical energy storage.
Amount of supply capacity submitted to an auction.
Quantity submitted in a bid or offer.
Also called: Bid submission
Submission of trading conditions such as price and quantity to a market.
Also called: Over-the-counter contract
Contract in which two parties agree on price, quantity and other terms.
Also called: OTC trading
Transaction negotiated directly between counterparties.
Also called: Biomass power generation
Generation using organic materials of biological origin as fuel or feedstock.
Also called: Block loaded
Condition in which registered minimum and maximum outputs coincide, leaving no dispatchable range.
Also called: Purchase bid
Order specifying conditions for purchasing electricity.
Also called: Purchase bid price
Price a buyer is willing to pay in a bid.
Quantity submitted for purchase.
Also called: Calendar ageing
Battery degradation driven by elapsed time and storage conditions, rather than cycling alone.
Also called: Capacity procurement agreement
Contract between the successful capacity provider and market administrator for securing supply capability.
Contractual monetary amount under a capacity agreement.
Also called: Capacity contribution charge
Allocated contribution payable by relevant businesses towards capacity procurement costs.
Ratio of actual generation to generation at rated power continuously throughout the period.
Market procuring future availability of electricity supply capability, rather than energy alone.
Also called: Requirements
Obligations a resource must satisfy under its capacity contract.
Revenue earned under capacity market arrangements.
Schedule managing planned unavailability of contracted capacity resources.
Also called: Capacity agreement payment
Payment made under a capacity agreement for contracted capacity obligations.
Entity contracted to provide capacity in the capacity market.
Also called: Capacity-providing resource
Resource providing supply capability in the capacity market.
Also called: kW value
Value of the ability to supply power, distinct from the value of delivered energy.
Also called: CAPEX · Capital cost
Capital expenditure on acquiring, constructing or improving long-lived assets.
State in which greenhouse gas emissions are balanced by removals within a defined scope.
Process of absorbing electricity into a battery to store energy.
Fraction of charging input energy converted into stored energy.
Electrical energy absorbed during charging over a specified period.
Electrical power absorbed by storage during charging.
Also called: Chubu
Electricity supply and JEPX pricing area serving part of central Japan.
Also called: Chugoku
Electricity supply and JEPX pricing area serving the Chugoku region of western Honshu.
Device capable of switching and interrupting an electrical circuit under normal or fault conditions.
Also called: Matched volume · Contracted volume
Quantity of transactions successfully matched in market clearing.
Also called: Market clearing price
Price applied to transactions cleared in a market.
Also called: Co-optimisation market · Simultaneous market
Market design jointly optimizing and clearing products such as energy and balancing capacity.
Also called: Combined award
Joint award of reserve products accounting for resource capabilities that may be shared across products.
Also called: Composite product
Balancing product awarded through combined clearing.
Also called: COD
Date on which contractual or applicable requirements for commercial operation are met.
Also called: Test operation
Process of testing and verifying functionality, performance and safety before commercial operation.
Also called: Curtailment due to grid congestion
Reduction of generation to respect network operating limits.
Operational or market measures for avoiding or relieving network congestion.
Also called: Connect and Manage
Framework facilitating connections through more effective use of existing networks and conditional operational restrictions.
Permitted or contracted connection capability at a grid interface.
Also called: Grid connection cost contribution
Portion of grid connection construction costs borne by the connecting applicant.
Condition that a feasible solution or operation must satisfy.
Also called: Commencement of construction
Commencement of physical construction works.
Trading method matching compatible orders as they arrive.
Revenue arising under agreed contractual prices or settlement conditions.
Also called: Corporate power purchase agreement
Agreement under which a corporate consumer procures electricity or associated attributes from a generator or supplier.
Also called: Cross-Area Wheeling Service
Delivery at a different location of an equivalent quantity of electricity received from the same counterparty, at the same time.
Also called: Output curtailment · Output control
Reduction of otherwise available generation because of supply-demand or network limitations, among other reasons.
Also called: Cycle ageing
Battery degradation associated with repeated charging and discharging.
Number of cycles achievable before a specified performance limit under defined test conditions.
Also called: Day-ahead co-optimisation market
Proposed day-ahead market jointly clearing energy and balancing capacity for the following day.
Also called: Spot market · Day ahead market
JEPX market for trading electricity for delivery the following day.
Also called: DSCR
Ratio of cash flow available for debt service to scheduled principal and interest payments.
Also called: Decarbonisation
Process of reducing greenhouse gas emissions and transitioning to low-emission systems.
Also called: Battery degradation
Reduction in battery capacity or performance due to operation or aging.
Date on which contracted electricity is delivered.
Time interval or period for contracted electricity delivery.
Also called: Physical delivery fiscal year · Physical delivery year
Fiscal year in which procured capacity is delivered and contractual obligations apply.
Also called: Capacity demand curve
Curve relating capacity price to the desired quantity of capacity procurement.
Difference between forecast electricity demand and actual demand.
Also called: DR
Adjustment of electricity consumption in response to prices, instructions or incentives.
Also called: DoD · DOD
Fraction of reference battery capacity removed by discharge.
Also called: Discharge energy
Electrical energy delivered during discharge over a specified period.
Process of releasing stored energy as electrical power.
Ratio of delivered discharge energy to the decrease in stored energy.
Electrical power supplied by storage during discharge.
Also called: Power dispatch
Instruction or coordination of resource operation in response to demand and network conditions.
Also called: Operating rights · Operational rights
Contractual rights to direct or determine asset operation and dispatch.
Also called: Dispatch-instructed capacity resource · Activation-instructed resource
Capacity-market category providing capability through instructed demand reduction, generation or other response.
Range between registered output bounds within which the market determines dispatch.
Also called: DER
Distributed resources such as generation, storage and controllable demand.
Also called: Distribution network
Local network delivering electricity from substations to consumers.
Also called: Distribution business operator
Operator of a distribution network serving its users.
Also called: Downward reserve
Capability to reduce net supply through lower generation or increased demand.
Also called: Sustained delivery duration
Period for which a required response must be sustained.
Also called: ED
Allocation of output to meet demand and operating conditions at minimum cost.
Also called: EDC
Control allocating generation output according to balancing needs and economic criteria.
Also called: Economic Max.
Participant-registered upper output bound, which need not equal the equipment's physical maximum.
Also called: Economic Min.
Participant-registered lower output bound, which need not equal the physical minimum of the equipment.
Also called: EPRX
Exchange operating Japan's balancing market.
Also called: Electric Facilities
Statutory category of installations used to generate, transform, transmit, distribute or consume electricity, subject to exclusions.
Also called: EGC
Body monitoring fair competition and trading in electricity and gas markets.
Collective category of regulated electricity activities, including retail, network and generation businesses, in this edition of the Act.
Japanese legislation regulating electricity businesses and electrical installations, including consumer protection and public safety objectives.
Also called: Electricity customer
Individual or business consuming electricity.
Also called: Power demand
Power or energy required by consumers or the electricity system.
Also called: Generation volume
Amount of electrical energy produced over a specified period.
Also called: Retail Electricity Business
Business providing retail supply, excluding activities classified under the Act as network or generation businesses.
Also called: Retail electricity supplier
Entity registered to carry on electricity retail under the Act.
Also called: Power system reform
Institutional reforms to electricity markets, industry structure and supply arrangements.
Collective statutory term for entities conducting the categories of electricity business listed in the Act.
Also called: Electricity arbitrage
Operation earning revenue from price differences, for example charging at lower prices and discharging at higher prices.
Also called: Energy storage capacity · Battery energy capacity
Quantity of energy a storage asset can hold, typically expressed in kWh or MWh.
Also called: EMS
System managing resource schedules, charging, discharging and energy allocation.
Also called: ERAB
Business aggregating and controlling distributed energy resources to provide electricity-market or customer services.
Revenue from selling electrical energy.
Also called: EPC
Integrated scope or contract covering engineering, procurement and construction.
Also called: Environmental attributes
Value representing environmental attributes or benefits associated with electricity or other activities.
Also called: EFC
Cumulative partial cycling expressed as equivalent full cycles against a reference capacity.
Capacity expected to be available after accounting for resource characteristics and availability.
Also called: EHV
Extra-high-voltage category defined under applicable Japanese electrical rules or agreements.
Also called: Feed-in premium scheme · FIP
Scheme supplementing renewable generators' market-based sales revenues with a calculated premium.
Also called: Feed-in tariff scheme · FIT
Scheme supporting eligible renewable generation through purchase at prescribed prices for specified periods.
Milestone at which financing agreements and applicable conditions are satisfied so funding can become available.
Also called: Economic penalty
Monetary consequence of non-compliance or failure to meet obligations.
Connection providing secured network access within specified operating conditions.
Also called: FIT approval
Approval of an eligible project plan or other required conditions for FIT participation.
Certificate representing non-fossil attributes of electricity generated under FIT.
Cost that does not vary directly with short-term output levels.
Ability to adjust generation, demand or storage operation in response to system or market changes.
Also called: Floating offshore wind power
Offshore wind generation using turbines mounted on floating platforms.
Difference between a forecast and its realized value.
Also called: Forward electricity market
Market for contracting electricity ahead of a future delivery period.
Number of AC electrical cycles per second, measured in hertz.
Control maintaining power system frequency within specified limits.
Also called: Power flow fluctuation
Variation in network flows caused by demand changes or resource response.
Also called: Fully merchant
Model relying on merchant revenues without a material contracted revenue hedge.
Also called: Gas-fired power generation
Thermal generation fuelled by natural gas or other applicable gases.
Also called: GC
Deadline for submitting or changing schedules for a delivery interval.
Also called: General Electricity Transmission and Distribution Business
Regional transmission and distribution business providing wheeling and adjustment services, including specified last-resort and island supply functions.
Also called: TSO · General transmission and distribution utility · General electricity transmission and distribution utility
Licensed regional transmission and distribution utility responsible for network operation and balancing-related functions.
Also called: Power Generation Quantity Adjustment Service
Under this edition of the Act, a service that receives generation and simultaneously provides the quantity nominated in advance by the generator at the same point.
Also called: Electricity Generation Business
Business operating qualifying generating facilities to produce electricity for retail and network businesses.
Also called: Power generation business operator · Generator · Electricity Generation Utility
Entity that has filed the statutory notification to conduct generation business; the business entity rather than the generating asset.
Also called: Power generation mix
Composition of generation by technology or fuel, measured by energy or capacity as specified.
Also called: Generation source outage · Generator trip
Unexpected loss of a generation resource, for example due to a fault.
Also called: Generation-side network charge
Network charging arrangement allocating part of network costs to generation-side users.
Also called: Geothermal power generation
Generation using heat from beneath the Earth's surface.
Also called: GF
Operation in which a governor or equivalent control automatically adjusts output in response to frequency.
Application submitting information required to request grant funding.
Formal decision approving grant funding subject to specified conditions.
Also called: GX
Policies and activities transforming industrial and economic systems towards decarbonization.
Also called: Network congestion
Condition in which network power flows exceed or risk exceeding allowable operating limits.
Also called: Grid interconnection
Electrical connection of generation, load or other equipment to the power system.
Also called: Interconnection agreement
Agreement between a network operator and connecting party setting connection arrangements and conditions.
Application initiating the relevant process for connecting equipment to the grid.
Technical assessment of connection feasibility, required works, cost and construction lead time.
Response communicating assessed connection conditions, costs and lead times to the applicant.
Also called: Network constraint
Restriction on system operation arising from equipment ratings, voltage, stability or other limits.
Also called: Power system operation
Activities operating the power system to maintain security and reliability.
Also called: Network augmentation
Works increasing network capacity, security or performance.
Also called: Power system stability
Ability of a power system to maintain or regain acceptable operation after disturbances.
Also called: Grid-scale battery energy storage system · Grid-scale battery
Grid-connected battery primarily used to charge and discharge in response to electricity system needs.
High-voltage category defined under applicable Japanese electrical rules or agreements.
Also called: Hokkaido
Electricity supply and JEPX pricing area covering Hokkaido.
Also called: Hokuriku
Electricity supply and JEPX pricing area serving Hokuriku and associated territory.
Also called: Hybrid power purchase agreement
Power purchase agreement defining delivery or settlement using a combination of generation and storage resources.
Also called: Hydroelectric power
Generation using the potential or kinetic energy of water.
Difference between scheduled and actual electricity quantities for settlement.
Settlement amount determined from imbalance volume and applicable prices.
Also called: Imbalance unit price
Unit price used to settle an imbalance quantity.
Energy difference between scheduled and actual values subject to settlement.
Also called: Additional auction
Subsequent auction adjusting capacity procurement in response to updated adequacy forecasts.
Additional cost of increasing output or production.
Curve representing incremental costs at different output levels.
Also called: Nameplate capacity
Aggregate rated capacity of installed equipment.
Also called: Cross-regional interconnection line · Interconnection line
Transmission facility connecting different electricity supply areas and enabling interchange.
Also called: IRR
Discount rate at which the net present value of a cash-flow series equals zero.
Also called: Intra-regional network
Power network within a single supply area.
Also called: Intra-Area Wheeling Service
Network delivery at another location of a specified electricity quantity for retail supply or qualifying self-generation arrangements.
Short-timescale changes in demand or renewable generation within a trading interval.
Also called: Intraday co-optimisation market
Proposed intraday market reoptimizing energy and balancing capacity using updated system information.
Also called: Intra-day market
Market for adjusting electricity positions after day-ahead trading and before delivery.
Also called: Isolated Island Service
Supply backstop for general electricity demand on qualifying isolated islands, under this edition of the Act.
Also called: JEPX
Exchange operating Japan's wholesale electricity markets.
Also called: Kansai
Electricity supply and JEPX pricing area serving Kansai and associated territory.
Also called: Kyushu
Electricity supply and JEPX pricing area serving Kyushu and associated territory.
Also called: Last Resort Service
Backstop supply for eligible customers not served under ordinary retail arrangements.
Also called: LCOE · Levelised cost of electricity
Levelized unit cost calculated by dividing discounted generation costs by discounted electricity output.
Also called: LCOS · Levelised cost of storage
Levelized cost of storage obtained by dividing discounted relevant storage costs by discounted discharged energy.
Also called: LFP battery
Lithium-ion battery using lithium iron phosphate as the cathode material.
Also called: Li-ion battery
Rechargeable battery operating through movement of lithium ions between electrodes.
Also called: LFC
Automatic adjustment of output to reduce frequency and interchange deviations.
Also called: Host TSO
General transmission and distribution utility for the area where the balancing resource is located.
Also called: LMP · Nodal marginal price
Marginal cost of serving additional demand at a particular network node, reflecting applicable constraints and losses.
Also called: Long-term decarbonised capacity auction · LTDA · LDA
Auction supporting investment in decarbonized and other eligible resources through long-term capacity revenue.
Principal capacity auction, normally procuring capability four years before delivery.
Additional cost per unit of a small increase in production.
Also called: Matching
Process of determining accepted trades, quantities and prices from submitted bids.
Ability to transact without materially moving the market price.
Entity administering a market and its trading processes.
Entity participating in market transactions.
Also called: Market separation
Market separation into areas with different clearing prices when interconnector limits bind.
Combined scope of the dispatchable ranges of self-scheduled resources and the full scheduling scope of pool-scheduled resources.
Upper output limit specified by equipment or market conditions.
Also called: Merchant business model
Business model relying principally on market-based revenues and exposure to market prices.
Also called: Uncontracted market revenue
Revenue exposed to market outcomes rather than secured under contracted revenue arrangements.
Economic ordering of resources, generally from lowest to highest marginal cost.
Shortest period a unit must remain offline after shutdown.
Lower output limit specified by equipment or market conditions.
Also called: No-load cost
Cost of operating a unit at its specified minimum output.
Shortest period a unit must remain online after starting.
Also called: METI
Japanese ministry responsible for industrial and energy policy, among other areas.
Also called: Must Run
Output corresponding to the economic minimum of a self-scheduled resource.
Also called: N-1 standard
Security criterion requiring specified system conditions to remain satisfied following a single contingency.
Also called: N-1 intertrip
Contingency-triggered tripping or control scheme protecting the grid against overload or other limits.
Also called: Demand reduction
Supply-equivalent effect created by reducing electricity demand.
Also called: NPV
Sum of cash flows discounted to present value at a specified discount rate.
Also called: NMC battery
Lithium-ion battery with a nickel-manganese-cobalt cathode chemistry.
Also called: Non-coincidence of reserve requirements
Property whereby peak requirements for different reserve products occur at different times.
Also called: Non-firm access
Connection allowing access subject to curtailment during congestion or other defined conditions.
Non-fossil certificate from non-FIT generation specifically designated as renewable.
Non-fossil certificate from non-FIT generation without a renewable designation.
Also called: NFC · Non-fossil fuel certificate
Certificate representing non-fossil attributes associated with a quantity of electricity.
Attribute of electricity generated from non-fossil energy sources.
Also called: Non-fossil value trading market
Market trading certificates representing non-fossil electricity attributes.
Also called: Nuclear power generation
Generation using heat released by nuclear fission.
Mathematical expression maximized or minimized in an optimization problem.
Also called: Offered volume
Amount of resource capability made available to the market.
Also called: Offshore wind power
Wind generation using turbines installed offshore.
Also called: Offtake contract
Agreement establishing terms for purchasing or taking output from an asset.
Also called: Off-taker
Counterparty purchasing output under an offtake agreement.
Also called: Okinawa
Electricity supply area serving Okinawa, which is not among the nine JEPX spot pricing areas.
Also called: Onshore wind power
Wind generation using turbines installed on land.
Also called: OPEX · Operating expenses
Expenditure incurred in operating and maintaining an asset or business.
Also called: O&M
Activities operating and maintaining assets to required performance and safety standards.
Also called: Transfer capability
Maximum power transfer permitted under specified security and operating conditions.
Also called: Optimisation
Process of finding the best feasible solution according to an objective function.
Also called: OCCTO · Organization for Cross-regional Coordination of Transmission Operators
Organization coordinating nationwide electricity supply, cross-regional grid operation and the capacity market.
Also called: Refund of revenues from other markets
Mechanism returning a prescribed portion of revenues earned in other markets under the applicable agreement.
Also called: Peak electricity demand
Highest electricity demand observed or forecast over the relevant period.
Consequence imposed for failing a contractual or regulatory obligation.
Also called: Performance assessment penalty
Penalty imposed for failing performance requirements in an assessment.
Also called: Real-time supply and demand
Stage at which electricity is physically supplied and consumed, rather than scheduled or traded in advance.
Also called: Physical power purchase agreement
Power purchase agreement involving physical delivery of electricity through the applicable supply arrangements.
Also called: Schedule-based balancing
Schedule-based framework requiring planned supply and demand to balance within specified intervals.
Also called: POC · Grid connection point
Electrical interface between an installation and the power system.
Also called: Market-scheduled resource · Pool Schedule
Under METI's proposed design, resource whose commitment and output up to its economic minimum depend on market clearing.
Also called: PCS · Power conversion system
Equipment converting between DC and AC electricity and controlling power output.
Ratio of active power to apparent power.
Also called: Load flow
Flow of electrical power through network equipment.
Also called: PPA
Agreement setting terms for the sale and purchase of electricity, such as price, quantity and duration.
Also called: Electric power system
System of generation, transmission, distribution and demand used to supply electricity.
Also called: FIP premium
FIP support payment rate calculated from the base and reference prices under applicable rules.
Also called: Pre-qualification
Process verifying a resource meets requirements before market participation.
Also called: Upper price limit
Maximum permitted trading or bid price.
Also called: Lower price limit
Minimum permitted trading or bid price.
Extent to which price responds to changes in relevant inputs or conditions.
Difference between two prices.
Also called: Frequency Containment Reserve · FCR
Fast autonomous frequency response; EPRX specifies response within ten seconds and sustained delivery of at least five minutes.
Japanese rules defining the order and treatment of resource reductions during oversupply and related conditions.
Also called: Procured quantity
Quantity secured through a procurement process.
Also called: FIT purchase price
Prescribed price for purchasing eligible electricity under Japan's FIT scheme.
Technical and operational conditions for participating in a market product.
Arrangement allocating profit among contractual parties.
Financing structure relying primarily on project cash flows and project assets for repayment.
Certification that a renewable generation business plan meets applicable statutory conditions.
Also called: Pumped hydro · Pumped hydro storage
Storage technology pumping water to an upper reservoir and later generating electricity through its release.
Rate at which resource output can change per unit of time.
Also called: Rated energy capacity
Nominal battery capacity specified under defined conditions, in the applicable energy or charge units.
Also called: Power rating
Rated power an asset can deliver or absorb under specified conditions.
AC power component associated with oscillating energy exchange in electric and magnetic fields.
Also called: Point of receipt
Point specified for receipt of electricity under a contract or metering arrangement.
Also called: Redispatch scheme
Adjustment of scheduled generation output to alleviate network congestion or other constraints.
Also called: FIP reference price
Calculated FIP reference reflecting expected market and environmental-value revenues and applicable adjustments.
Also called: Renewables
Energy obtained from naturally replenishing resources.
Difference between forecast and actual renewable generation.
Also called: Co-located battery storage
Battery storage system installed alongside a renewable generation facility.
Also called: Renewable energy surcharge · Renewable energy levy
Levy collected from electricity users to finance eligible renewable energy support costs.
Capacity from another eligible resource used to replace contracted capability.
Amount of balancing capability required to manage expected system deviations.
Spare supply capability retained to cover demand increases or resource losses.
Ratio of supply capacity in excess of demand to demand.
Also called: RA
Aggregator directly managing individual customer or asset resources.
Time allowed to reach the required response following a signal or frequency deviation.
Also called: Retail Service
Supplying electricity to meet ordinary customer demand.
Also called: Minimum revenue guarantee
Contractual arrangement providing a minimum revenue level subject to agreed conditions.
Arrangement allocating revenues among parties according to agreed terms.
Also called: Value stacking
Combination of revenues from multiple compatible markets and services, subject to asset and market constraints.
Power flow in the direction opposite to the conventional supply direction.
Also called: RTE · Round trip efficiency
Ratio of recovered discharge energy to charging energy over a cycle with consistent boundaries and state of charge.
Power flow expected or scheduled according to trading and operating plans.
Also called: Planned value
Previously submitted or specified value for generation, demand or another quantity.
Also called: Synchronized Frequency Restoration Reserve · S-FRR
Reserve addressing short-period fluctuations and unexpected generation losses.
Also called: Frequency Restoration Reserve · FRR
Reserve addressing longer-period forecasting deviations after gate closure.
Also called: SCED
Economic optimization of resource dispatch subject to network security and operating constraints.
Also called: SCUC
Optimization of generation commitment decisions subject to network security and operating constraints.
Use of electricity generated by an entity to meet its own consumption.
Generation of electricity by an entity for its own purposes.
Also called: Self-scheduled generator · Self Schedule
Under METI's proposed design, resource whose owner determines commitment and output up to the economic minimum.
Also called: Sell bid
Order specifying conditions for selling electricity.
Also called: Sell bid price
Price at which a seller offers electricity.
Quantity offered for sale.
Also called: Trading slot · Time slot
Time slot used for trading, metering or settlement.
Also called: Dual value
Marginal change in the optimized objective associated with changing a constraint bound.
Also called: Shikoku
Electricity supply and JEPX pricing area serving Shikoku and associated territory.
Also called: Fault level
Fault level at a network point expressed as apparent power derived from prospective short-circuit current.
Also called: Co-clearing
Joint determination of awards across products or resources while considering their shared constraints.
Also called: Uniform-price auction
Auction method applying a common clearing price to accepted trades in a product.
Also called: Solar photovoltaic power generation · Photovoltaic power generation
Generation converting sunlight directly into electricity using photovoltaic devices.
Also called: SPV · Special purpose company · SPC
Legal entity established to hold assets, contracts or financing for a specified project.
Also called: Specified Electricity Transmission and Distribution Business
Business providing retail or qualifying wheeling services at designated supply points using its own network facilities.
Also called: Specified Electricity Transmission and Distribution Utility
Entity that has filed the statutory notification to conduct specified T&D business.
Also called: Stable power resource
Japan capacity-market category for resources meeting specified stable supply capability conditions.
Also called: Security of supply
Ability to provide required electricity reliably and continuously.
Also called: Standalone battery storage
Battery storage system operated independently rather than as a co-located generation asset.
Energy lost while an asset is on standby through self-discharge, auxiliary use or similar mechanisms.
Also called: Startup cost
Cost incurred in bringing an offline unit into operation.
Also called: SOC · SoC
Indicator of current stored charge or energy relative to a specified reference capacity.
Also called: SOH · SoH
Indicator of retained battery capacity or performance relative to a reference condition.
Also called: Discharge duration
Time for which usable stored energy can be discharged at a specified power level.
Also called: Basic Energy Plan
Japanese government plan establishing the fundamental direction of energy policy.
Also called: Grant
Financial assistance for activities meeting specified policy objectives and eligibility conditions.
Facility containing equipment for voltage transformation, switching and protection.
Also called: Available supply capacity
Capability to provide electricity when required.
Also called: Supply and demand balance
Matching electricity supply and consumption, including losses and other applicable quantities.
Also called: Curtailment due to supply-demand balance constraints
Reduction of generation to prevent oversupply and maintain supply-demand balance.
Power system property resisting frequency changes through stored rotational energy and, where applicable, equivalent response.
Unconstrained national clearing price calculated before interconnector limits are applied.
Target amount of supply capacity to be procured.
Also called: Replacement Reserve · RR
Reserve addressing post-gate-closure demand and renewable forecasting deviations and generation losses.
Also called: Replacement Reserve-for FIT · RR-FIT
Reserve addressing renewable generation forecasting deviations under FIT special arrangements (1) and (3).
Also called: Thermal power generation
Generation using heat energy, commonly produced by fuel combustion.
Self-accelerating heat-generating process that can lead to uncontrolled temperature rise.
Also called: 3-part offer
Offer format representing resource costs through start-up, minimum-output and incremental-cost components.
Also called: Trading interval code
Code identifying a trading or delivery interval.
Also called: Tohoku
Electricity supply and JEPX pricing area serving the Tohoku region and associated territory.
Also called: Tokyo
Electricity supply and JEPX pricing area serving the Tokyo region and associated territory.
Also called: Tolling contract
Agreement granting specified rights to use an asset in exchange for agreed fees and other contractual terms.
Fee paid under a tolling agreement for contracted capacity or asset-use rights.
Sum of purchase bid volumes for the specified market and period.
Sum of sell offer volumes for the specified market and period.
Also called: Non-fossil certificate with tracking
Non-fossil certificate carrying information about the originating generation source.
Date on which a trade is executed.
Fee charged for using a market or executing trades.
Price at which a transaction takes place.
Also called: Traded volume
Quantity traded in the relevant transactions.
Equipment using electromagnetic induction to change AC voltage and current levels.
Also called: Electricity Transmission Business
Business using qualifying transmission facilities to provide cross-area wheeling to general T&D utilities, excluding general T&D business itself.
Also called: Transmission network
Network transporting bulk electricity between generation facilities, substations and other nodes.
Conductors and associated equipment transmitting electricity between locations.
Also called: Transmission loss
Power or energy lost during transmission, for example through electrical resistance.
Also called: Electricity Transmission Utility
Entity licensed to conduct electricity transmission business.
Also called: UC
Schedule determining which generating units operate and when they start or stop.
Also called: Uplift
Supplementary payment, for example to recover eligible costs not covered by market-price revenues.
Also called: Upward reserve
Capability to increase net supply through higher generation or reduced demand.
Energy accessible within the permitted operating state-of-charge range.
Also called: Variable power resource
Capacity-market classification for resources whose output varies with conditions such as weather.
Also called: Variable power resource (aggregated)
Capacity-market category for aggregated variable resources meeting eligibility conditions collectively.
Also called: Variable power resource (standalone)
Variable resource meeting applicable participation requirements individually.
Also called: VPP
Coordinated control of distributed resources so that they can provide services collectively like a power plant.
Also called: Virtual power purchase agreement · VPPA
Agreement providing financial settlement and often environmental attributes without direct physical delivery to the buyer.
Electric potential difference between two points.
Also called: Volume-weighted average clearing price
Average clearing price weighted by cleared transaction volume.
Average price calculated using specified weights.
Also called: Network use charges · Wheeling charge
Charge for using transmission and distribution networks to convey electricity.
Statutory service category encompassing cross-area and intra-area wheeling.
Also called: Wholesale power market
Market where electricity is bought and sold between wholesale participants.
Price formed in wholesale electricity transactions.
Also called: Wind power generation
Generation converting wind energy into electricity using turbines.
Also called: Delta-kW I
Day-ahead anticipated shortfall between TSO demand forecasts and retailers' procured demand.
Also called: Delta-kW II
Capability for post-gate-closure balancing, corresponding to current primary through tertiary (1) reserves.
Also called: Delta-kW III
Capability covering pre-gate-closure variability of renewables under FIT special arrangements, corresponding to tertiary (2).