Japan electricity market glossary
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
42 terms
Balancing capability whose activation is restricted because it could recreate network congestion.
Also called: Block loaded
Condition in which registered minimum and maximum outputs coincide, leaving no dispatchable range.
Also called: Co-optimisation market · Simultaneous market
Market design jointly optimizing and clearing products such as energy and balancing capacity.
Also called: Combined award
Joint award of reserve products accounting for resource capabilities that may be shared across products.
Condition that a feasible solution or operation must satisfy.
Also called: Day-ahead co-optimisation market
Proposed day-ahead market jointly clearing energy and balancing capacity for the following day.
Range between registered output bounds within which the market determines dispatch.
Also called: ED
Allocation of output to meet demand and operating conditions at minimum cost.
Also called: Economic Max.
Participant-registered upper output bound, which need not equal the equipment's physical maximum.
Also called: Economic Min.
Participant-registered lower output bound, which need not equal the physical minimum of the equipment.
Also called: Power flow fluctuation
Variation in network flows caused by demand changes or resource response.
Additional cost of increasing output or production.
Curve representing incremental costs at different output levels.
Short-timescale changes in demand or renewable generation within a trading interval.
Also called: Intraday co-optimisation market
Proposed intraday market reoptimizing energy and balancing capacity using updated system information.
Also called: LMP · Nodal marginal price
Marginal cost of serving additional demand at a particular network node, reflecting applicable constraints and losses.
Additional cost per unit of a small increase in production.
Combined scope of the dispatchable ranges of self-scheduled resources and the full scheduling scope of pool-scheduled resources.
Upper output limit specified by equipment or market conditions.
Shortest period a unit must remain offline after shutdown.
Lower output limit specified by equipment or market conditions.
Also called: No-load cost
Cost of operating a unit at its specified minimum output.
Shortest period a unit must remain online after starting.
Also called: Must Run
Output corresponding to the economic minimum of a self-scheduled resource.
Also called: Non-coincidence of reserve requirements
Property whereby peak requirements for different reserve products occur at different times.
Mathematical expression maximized or minimized in an optimization problem.
Also called: Optimisation
Process of finding the best feasible solution according to an objective function.
Also called: Market-scheduled resource · Pool Schedule
Under METI's proposed design, resource whose commitment and output up to its economic minimum depend on market clearing.
Rate at which resource output can change per unit of time.
Difference between forecast and actual renewable generation.
Also called: SCED
Economic optimization of resource dispatch subject to network security and operating constraints.
Also called: SCUC
Optimization of generation commitment decisions subject to network security and operating constraints.
Also called: Self-scheduled generator · Self Schedule
Under METI's proposed design, resource whose owner determines commitment and output up to the economic minimum.
Also called: Dual value
Marginal change in the optimized objective associated with changing a constraint bound.
Also called: Co-clearing
Joint determination of awards across products or resources while considering their shared constraints.
Also called: Startup cost
Cost incurred in bringing an offline unit into operation.
Also called: 3-part offer
Offer format representing resource costs through start-up, minimum-output and incremental-cost components.
Also called: UC
Schedule determining which generating units operate and when they start or stop.
Also called: Uplift
Supplementary payment, for example to recover eligible costs not covered by market-price revenues.
Also called: Delta-kW I
Day-ahead anticipated shortfall between TSO demand forecasts and retailers' procured demand.
Also called: Delta-kW II
Capability for post-gate-closure balancing, corresponding to current primary through tertiary (1) reserves.
Also called: Delta-kW III
Capability covering pre-gate-closure variability of renewables under FIT special arrangements, corresponding to tertiary (2).