Dispatch給電
Also called: Power dispatch
Editorial definition
Definition
Instruction or coordination of resource operation in response to demand and network conditions.
In Japanese
給電
需給や系統条件に応じて発電等の運転を指示・調整すること。
Sources
No term-level source verified; the definition is editorial.