Japan electricity market glossary
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
English and Japanese terms for Japan's power markets, grid and battery storage, with short definitions in both languages. Use it to read Japanese sources and to translate consistently.
63 terms
Also called: Real power
Component of electrical power converted into net work, heat or other energy forms.
Magnitude of AC power based on RMS voltage and current, measured in VA.
Also called: Available connection capacity
Grid capability remaining available for additional use or connections under applicable conditions.
Also called: Main transmission network
Principal transmission network carrying bulk electricity.
Device capable of switching and interrupting an electrical circuit under normal or fault conditions.
Also called: Curtailment due to grid congestion
Reduction of generation to respect network operating limits.
Operational or market measures for avoiding or relieving network congestion.
Also called: Connect and Manage
Framework facilitating connections through more effective use of existing networks and conditional operational restrictions.
Permitted or contracted connection capability at a grid interface.
Also called: Grid connection cost contribution
Portion of grid connection construction costs borne by the connecting applicant.
Also called: Cross-Area Wheeling Service
Delivery at a different location of an equivalent quantity of electricity received from the same counterparty, at the same time.
Also called: Output curtailment · Output control
Reduction of otherwise available generation because of supply-demand or network limitations, among other reasons.
Also called: Power dispatch
Instruction or coordination of resource operation in response to demand and network conditions.
Also called: Distribution network
Local network delivering electricity from substations to consumers.
Also called: Electric Facilities
Statutory category of installations used to generate, transform, transmit, distribute or consume electricity, subject to exclusions.
Also called: EHV
Extra-high-voltage category defined under applicable Japanese electrical rules or agreements.
Connection providing secured network access within specified operating conditions.
Number of AC electrical cycles per second, measured in hertz.
Also called: Power Generation Quantity Adjustment Service
Under this edition of the Act, a service that receives generation and simultaneously provides the quantity nominated in advance by the generator at the same point.
Also called: Generation-side network charge
Network charging arrangement allocating part of network costs to generation-side users.
Also called: Network congestion
Condition in which network power flows exceed or risk exceeding allowable operating limits.
Also called: Grid interconnection
Electrical connection of generation, load or other equipment to the power system.
Also called: Interconnection agreement
Agreement between a network operator and connecting party setting connection arrangements and conditions.
Application initiating the relevant process for connecting equipment to the grid.
Technical assessment of connection feasibility, required works, cost and construction lead time.
Response communicating assessed connection conditions, costs and lead times to the applicant.
Also called: Network constraint
Restriction on system operation arising from equipment ratings, voltage, stability or other limits.
Also called: Power system operation
Activities operating the power system to maintain security and reliability.
Also called: Network augmentation
Works increasing network capacity, security or performance.
Also called: Power system stability
Ability of a power system to maintain or regain acceptable operation after disturbances.
High-voltage category defined under applicable Japanese electrical rules or agreements.
Also called: Cross-regional interconnection line · Interconnection line
Transmission facility connecting different electricity supply areas and enabling interchange.
Also called: Intra-regional network
Power network within a single supply area.
Also called: Intra-Area Wheeling Service
Network delivery at another location of a specified electricity quantity for retail supply or qualifying self-generation arrangements.
Also called: Isolated Island Service
Supply backstop for general electricity demand on qualifying isolated islands, under this edition of the Act.
Also called: Last Resort Service
Backstop supply for eligible customers not served under ordinary retail arrangements.
Economic ordering of resources, generally from lowest to highest marginal cost.
Also called: N-1 standard
Security criterion requiring specified system conditions to remain satisfied following a single contingency.
Also called: N-1 intertrip
Contingency-triggered tripping or control scheme protecting the grid against overload or other limits.
Also called: Non-firm access
Connection allowing access subject to curtailment during congestion or other defined conditions.
Also called: Transfer capability
Maximum power transfer permitted under specified security and operating conditions.
Also called: POC · Grid connection point
Electrical interface between an installation and the power system.
Ratio of active power to apparent power.
Also called: Load flow
Flow of electrical power through network equipment.
Also called: Electric power system
System of generation, transmission, distribution and demand used to supply electricity.
Japanese rules defining the order and treatment of resource reductions during oversupply and related conditions.
AC power component associated with oscillating energy exchange in electric and magnetic fields.
Also called: Point of receipt
Point specified for receipt of electricity under a contract or metering arrangement.
Also called: Redispatch scheme
Adjustment of scheduled generation output to alleviate network congestion or other constraints.
Power flow in the direction opposite to the conventional supply direction.
Power flow expected or scheduled according to trading and operating plans.
Also called: Fault level
Fault level at a network point expressed as apparent power derived from prospective short-circuit current.
Facility containing equipment for voltage transformation, switching and protection.
Also called: Supply and demand balance
Matching electricity supply and consumption, including losses and other applicable quantities.
Also called: Curtailment due to supply-demand balance constraints
Reduction of generation to prevent oversupply and maintain supply-demand balance.
Power system property resisting frequency changes through stored rotational energy and, where applicable, equivalent response.
Equipment using electromagnetic induction to change AC voltage and current levels.
Also called: Transmission network
Network transporting bulk electricity between generation facilities, substations and other nodes.
Conductors and associated equipment transmitting electricity between locations.
Also called: Transmission loss
Power or energy lost during transmission, for example through electrical resistance.
Electric potential difference between two points.
Also called: Network use charges · Wheeling charge
Charge for using transmission and distribution networks to convey electricity.
Statutory service category encompassing cross-area and intra-area wheeling.