ConstructionChubu · Omaezaki-shi, Shizuoka
NC Omaezaki Ikeshinden Battery Storage Facility≈NC御前崎市池新田蓄電所
Power1.997MW
Energy8.128MWh
Duration4.1h
COD2026-04
Announced2026-04-14
COD: Only the month is known; the exact day is not confirmed.
Operation scheduled to start from April 2026. No explicit statement at time of publication that operation has started.
Participants
- Developer
- NIPPON CHIKUDENCHI, INC. · Sun Village Co., Ltd. · Tokyu Power Supply Co., Ltd.≈
- TNSP
- Chubu Electric Power Grid
Suppliers, aggregator, market details and sources are available to members.Sign in
Other battery storage projects in Shizuoka
- Shizuoka Prefecture Ito City Reikawatoge Extra-High Voltage Battery Storage Facility≈71 MW / 285 MWhPlanned
- Fukuroi Ugari Battery Storage Facility≈99.9 MW / 280 MWhPlanned
- Kikugawa Nishimura Battery Storage Facility≈90 MW / 270 MWhConstruction
- Kikugawa Battery Storage Facility≈30 MW / 134 MWhPlanned
- SGET Hamamatsu Battery Storage Facility≈30 MW / 110.3 MWhPlanned
- ENEOS Power Shimizu Oil Depot Grid-Scale Battery Storage Facility (tentative name)≈50 MW / 109.7 MWhPlanned