PlannedKansai · Wakayama-shi, Wakayama

Wakayama City Grid-Scale Battery Storage Facility (JPN/Erevista, tentative name)≈和歌山市系統用蓄電所(JPN・エレビスタ/仮称)

Power1.99MW
Energy8.128MWh
Duration4.1h
COD2026-03
Announced2025-08-12

COD: Only the month is known; the exact day is not confirmed.

In September 2025, a sales and purchase agreement with Erevista was announced for the grid-scale battery storage facility in Wakayama City developed by JPN. Grid interconnection and equipment operation start were scheduled for March 2026. As of 10 October 2026, no public materials confirmed completion of grid interconnection, start of equipment operation, or closing of the sale. The project is at the last confirmed development stage, which is not a determination that it is not operating.

Participants

Developer
Japan Energy General System Co., Ltd.
TNSP
Kansai Transmission and Distribution
Suppliers, aggregator, market details and sources are available to members.Sign in

Other battery storage projects in Wakayama

See all 7 projects in Wakayama →